DPS Permit-Ready ADUs | Exact Steel Models, Lot Fit, Cost & Materials | FrameUpNow
FrameUpNow × Design Path Studio

Start With a Permit-Ready ADU. Continue With the Exact Build-Ready Steel Model.

Every one of the 186 DPS models connects directly to its precise FrameUpNow counterpart—engineered in cold-formed steel and equipped with tools to verify lot fit, estimate total construction cost, and price the materials needed to complete the home.

186exact DPS model connections
18Southern California jurisdictions
1 clickfrom DPS plan to exact steel counterpart
Design Path Studio and FrameUpNow preview
One button. The exact match. Select “Browse Compatible Steel Frame Homes” on a DPS model and go directly to that same home on FrameUpNow.
186 Exact Model Connections

Choose the DPS design. Continue with its precise steel solution.

The customer does not need to search for a corresponding frame or wonder whether two model names describe the same home. DPS makes the connection directly.

A connected path from plan selection to construction certainty

Design Path Studio has created permit-ready ADU collections for 18 Southern California jurisdictions. FrameUpNow has converted all 186 featured DPS models into engineered cold-formed steel framing systems. The walls, joists, beams, girders, and trusses have already been modeled and engineered so the selected frame can move toward manufacturing when ordered.

What “Build Ready” Means

The plan is ready. The steel skeleton is ready. The decisions can be ready, too.

Build ready does not mean no permit is required. It means the steel framing system has already been modeled, engineered, and prepared for manufacturing, while each project remains subject to local review.

Engineered steel skeletonA complete cold-formed steel framing system for the selected DPS model.
IBC-based design setA previously engineered frame package prepared around applicable design criteria.
Supporting calculationsEngineering documentation prepared to support local agency review.
Foundation engineeringProject-specific foundation design coordinated with the frame and site conditions.
Manufacturing readinessThe digital model is prepared for production before the customer orders.
Three Questions Answered Before Construction

Know It Fits. Know the Cost. Know What to Buy.

FrameUpNow turns a selected DPS design into a more informed, site-aware and financially prepared construction decision.

1

Plan Fit Visualizer

See the selected floor plan on the customer’s actual property.

Feature: Place the exact FrameUpNow floor plan on the lot in a real-world site context.

Benefit: Evaluate whether the design is appropriate before investing in engineering revisions, permitting or construction.

Result: A plan the customer likes becomes a plan they can evaluate on the lot where it may actually be built.

2

Total Construction Cost Estimator

Move beyond the price of the frame to the expected cost of the completed home.

Feature: Develop an early planning estimate for the full construction project.

Benefit: Gain an early financial view of the entire project and test whether the selected model aligns with the available budget.

Result: A design decision becomes a better-informed investment decision before bids and contracts.

3

Materials Shopping List

Know the products and quantities required to complete the home.

Feature: The BIM model produces a generic, model-specific bill of materials covering the elements needed to finish the home.

Benefit: Generic descriptions preserve freedom of choice and support product personalization and pricing.

Result: Move from broad allowances to an organized shopping and pricing plan with fewer omissions and surprises.

One Model. Four Connected Layers of Certainty.

A better way to prepare before the first dollar is spent.

The value is the uninterrupted progression from an approved design concept to a site-aware, cost-aware, materials-aware, engineered construction plan.

01
SelectChoose one of the 186 DPS permit-ready ADU models.
02
ConnectOpen the exact matching FrameUpNow model.
03
Verify FitPlace the floor plan on the actual lot using the Plan Fit Visualizer.
04
EstimateDevelop an early estimate of the total cost to complete the home.
05
Price MaterialsDownload the BIM-generated Materials Shopping List and personalize product choices.
06
Prepare for ApprovalUse the steel-frame design set, calculations and foundation engineering for submission.
07
Order the FrameAfter approval and order, move the manufacturing-ready model toward production.
Choose the plan where it works best for you

Start with the DPS design, then account for the jurisdiction.

Build in the original DPS jurisdiction

Begin with a plan accepted through that city’s permit-ready program. The city will still review the site plan, proposed steel framing package, foundation design and property-specific conditions.

Build in another jurisdiction

Use the DPS design as a proven starting point. Architectural, energy, insulation, solar, climate, fire or other local requirements may require modification before approval.

Questions Customers May Ask

Clear expectations before construction begins.

Does every DPS design have a matching steel model?

Yes. Each of the 186 DPS models includes a “Browse Compatible Steel Frame Homes” button that connects directly to the precise matching model on FrameUpNow.

What does the Plan Fit Visualizer tell me?

It places the selected floor plan on the customer’s actual lot so the model can be evaluated in its intended site context. Final placement remains subject to surveys, setbacks, easements, access, utilities and local review.

What does the Cost Estimator include?

It provides an early planning estimate for the total construction project, including the FrameUpNow steel frame and the work required to complete the home. It is not a contractor’s final quotation.

What is the Materials Shopping List?

It is a BIM-generated, generic bill of materials identifying the products and quantities required to complete the selected home. Generic descriptions allow the customer to choose preferred brands, styles and price levels.

Are DPS permit-ready plans automatically approved for steel construction?

No. The original permit-ready approval generally applies to the published wood-frame plan. FrameUpNow supplies an engineered steel alternative, supporting calculations and foundation engineering for project-specific agency review.

Does “build ready” mean no permit is required?

No. Build ready means the steel framing system has already been modeled, engineered and prepared for manufacturing. Every project remains subject to local permitting, site review and jurisdiction-specific requirements.

Your ADU design is ready. Its steel skeleton—and the information needed to plan the finished home—are ready, too.

Choose the DPS model, open its exact FrameUpNow counterpart, and move forward with greater certainty about fit, cost, materials, engineering and manufacturing.